Tennessee Reserve StudiesGet a quote
Menu

What a reserve study costs in Tennessee

Most Tennessee associations pay between $2,000 and $8,000 for a full reserve study, and less for an update. These are typical ranges, a guide and not a quote, drawn from prices published by firms and cost guides.

By kind of study

StudyTypical feeWhat you get
Full study (Level I)$2,000 to $8,000Every component counted and measured on site, with a 30-year funding plan. Typical for 50 to 150 homes.
Update with a site visit (Level II)$1,000 to $6,400The existing inventory is walked again and re-priced; firms put it at about half to four fifths of a full study.
Update from the desk (Level III)$500 to $4,000No visit: new costs, balances and timing applied to the last study, often under $1,000 for a small community.

Levels follow the definitions in CAI's reserve study standards. No trade body or agency publishes dollar figures, so these ranges are ours.

By size of community (full study)

CommunityTypical feeUsually looks like
Under 50 homes$1,500 to $5,000Few amenities; townhome rows, small condo buildings
50 to 150 homes$2,000 to $8,000The usual suburban association with a pool
150 to 300 homes$5,000 to $20,000+Several buildings, clubhouse, private streets
Mid-rise or high-rise condominium$7,000 to $15,000+Elevators, garage, central plant, roof membranes

What moves a quote up or down

  • Number of components, not homes. A pool, clubhouse, gate, ponds and a mile of private road add more time than another fifty driveways.
  • Building height. Elevators, a parking structure, roof membranes and a fire alarm system need closer inspection; mid-rise and high-rise buildings sit at the top of the ranges.
  • Records. A board that can hand over the last study, the past three budgets and invoices for recent projects saves the specialist hours.
  • Travel. A firm based in Nashville quoting for a resort association in the Smokies, or one in Atlanta quoting for Memphis, may add travel time.
  • Extras. An insurance replacement cost appraisal or a structural review is usually quoted on top.

Getting a fair quote

Ask what level of study is being quoted, whether the site visit includes building interiors and roofs, how many years the funding plan covers, and whether the fee includes a meeting with the board. Two quotes for "a reserve study" can describe quite different work.

Questions about fees

Why is the range so wide?

Because the work is. Twenty townhomes with a mailbox kiosk and a short private drive take a specialist half a day on site. A twelve-story building with a garage, two elevators and a chiller plant takes days, and often an engineer for the structure and facade.

Is an update always cheaper?

Usually. An update reuses the component list from the last study, so the specialist checks and re-prices rather than starting again. If the last study is old, thin or was done by another firm, expect the quote to sit closer to a full study.

Does a Tennessee condo need a full study every five years?

The law asks for an updated study at least every five years; it does not say which level. Many boards alternate: a full study, then an update with a site visit five years later. See five-year updates.

Who pays for the study?

The association, from its operating budget or the reserve fund itself, depending on what the governing documents allow. We charge the association nothing.

Get a quote for your association

It takes about a minute: where the community is, who we should speak to, and some optional detail about the buildings.

Tennessee Reserve Studies makes introductions; it does not carry out studies. You get the name of one firm active in your part of the state first, and your details travel only with your agreement.

Step 1 of 3

Which ZIP code is the community in?
Get a quote